“ACG” LLC carries out activities on railway designing and construction control. The company also was involved in installation works for railway signs and surveying points used in measurements in Azerbaijan. Quality and timely delivery of implemented projects has paved the way for new projects and successful results are being achieved in ongoing projects.
Within the framework of design of the railway, measurements, studies and testing, development of action plan on land acquisition, resettlement and the preparation of an Environmental Impact Assessment Report are carried out by the company with high quality and in accordance with modern requirements.
Carrying out technical control of construction works, activities are underway on the construction of a depo design and installation of equipments for the maintenance of locomotives in Bilajari and Ganja
Construction technical control service is provided for a renewal of the traction substations, catenary network, signaling and communication system for switching from direct current to alternating current of traction system of the Bilajari - Yalama (192 km) part of North-South railway corridor, as well as technical control over the construction of the railway reconstruction project is implemented.
The project of railways is carried out by ACG LLC with high quality. Within the framework of the project, engineering search works, comparison of alternatives and selection of a new road axis, economic justification report, topography and geology of the area, preparation of environmental protection, social and migration report, design of artificial facilities and other project and estimate documents are prepared and submitted to the order.
ACG LLC implements economic justification projects for the reconstruction of railway lines with quality. During the project, embankment, artificial structures, road infrastructure, contact network, communication and signaling devices along the road is being analyzed and appropriate proposals are presented. Comparative reports made and the result presented in a justified manner.
During the implementation of the project works, regular communication and consultations are conducted with the relevant authorities. Consent letters are obtained by properly informing about the work to be done. Works on communication lines and other elements are carried out together with representatives of relevant bodies.