Preparation of project tendering documents for Yalama Railway Station Upgrade Works
September 2022
On-going
- Reporting of geology engineer research
- Source report of potential building materials
- Preparation of main plan
- Preparation of working draft
- Preparation of project electrification and communication system
- Ecology/ hydrology research work, main and architechture work, dreainage system
Preparation of project tendering documents for Bash Alat Railway Station Upgrade Works
September 2022
On-going
- Reporting of geology engineer research
- Source report of potential building materials
- Preparation of main plan
- Preparation of working draft
- Preparation of project electrification and communication system
- Ecology/ hydrology research work, main and architechture work, dreainage system
Repair of existing railway lines with a total length of 15.2 km within Bash Alat railway station, prolongation of existing railway for 400 meter, Ecology/ hydrology research work, main and architechture work.
Consulting Services for Engineering and Construction Supervision for Rehabilitation of track along Yalama- Sumgait Corridor
October 2019
On-going
The Project objective is to improve railways services in Azerbaijan, as well as Azerbaijan Railways CJSC (ADY) competitiveness, financial sustainability, operating and cost efficiency, and capacity, in particular along the North - South transport conidor (YalamaSumgait section).
The works component of the Project will be procured as two Lots comprising:
a) Lot 1 - double electrified track with ballast track superstructure from Sumgait Station (Km 2621 +000) to Gil-Gil-Chay Station (Km 2538+200), 82.8km
b) Lot 2 - double electrified track with ballast track superstructure from Gil-Gil-Chay Station (Km 2538+200) to Russian border at Yalama (Km 2454+500), 83.7km